Facebook Twitter LinkedIn YouTube Menu Search Arrow Right Arrow Left Arrow Down Arrow Up Home Arrow Next Arrow Previous RSS Icon Calendar Icon Warning Icon

Filter the results

  • Enter one or more words to find resources containing any of the words entered
  • Enter words or phrases between " " to find exact match

Resource categories

Resource Library

Why “White Coils” are a “Red Flag”

The importance of preventing the ingress of air during global vacuum pressure impregnation of form-coil windings

  • September 2022
  • Number of views: 2566
  • Article rating: 3.3
Article

The goal of vacuum pressure impregnation is complete saturation of a winding with insulating resin. As resin penetrates the insulating materials, it causes them to darken. If some insulation is a lighter shade, the coil or jumper is not fully saturated. The winding is not properly protected, and if the problem is not addressed, it is likely to cause premature failure of the unit. This could result in costly warranty work, or at a minimum, will be a failure to provide your customers with the quality they expect and deserve.

Porqué las "Bobinas Bancas" son una "Señal de Alarma"

La importancia de prevenir el ingreso de aire durante la impregnación global por vacío y presión de los bobinados preformados

  • September 2022
  • Number of views: 1857
  • Article rating: No rating
Article

El objetivo de la impregnación por vacío y presión (VPI) es saturar completamente un devanado con resina aislante. A medida que la resina penetra en los materiales aislantes, los oscurece y al drenar la resina VPI del devanado, todo el aislamiento de las cabezas queda oscuro en un tono uniforme. El aislamiento de la conexión también debe quedar oscuro de forma pareja. Si algún aislamiento muestra un tono más claro, la bobina o el puente no han quedado completamente saturados y el devanado no está debidamente protegido. Si no se soluciona el problema, es probable que esto provoque un fallo prematuro en el equipo. Esto podría generar una garantía costosa o, como mínimo, la reparación no brindará a sus clientes la calidad que esperan y merecen.

Resin Treatment Tips for Service Centers

  • October 2021
  • Number of views: 9602
  • Article rating: No rating
Article

One of the most briskly debated issues in our industry is the comparison – and procedures for – vacuum pressure impregnation (VPI) versus dip & bake. For this article, the discussion has been expanded to include trickle epoxy and B-stage coils.

Consejos para el Tratamiento con Resina en los Centros de Servicio

  • October 2021
  • Number of views: 8466
  • Article rating: 3.0
Article
Uno de los temas más debatidos en nuestra industria es la comparación y los procedimientos de impregnación a presión al vacío (VPI) versus inmersión y horneado. Para este artículo, la discusión se ha ampliado para incluir bobinas de etapa B y epoxi de goteo.

Condition Assessment of Stator Windings in Medium-Voltage Global VPI Machines

  • June 2014
  • Number of views: 7164
  • Article rating: No rating
Convention presentation

This paper, presented at the 2014 EASA Convention, describes research done by EASA service shops on the effectiveness and practicality of using offline partial discharge combined with a dielectrics characteristic test to evaluate the consolidation of stator windings in medium voltage machines manufactured by GVPI.

How to build a VPI system for your service center

  • November 2005
  • Number of views: 7932
  • Article rating: 4.0
Article

There seems to be a long and never ending list of equipment and facilities needed by most EASA service centers. But often we are constrained by cost, available space, and more urgent priorities that keep us from fulfilling some of these needs. One such (almost mandatory) need is a vacuum pressure impregnation (VPI) system. Normally there are two ways to provide this service. One way is to have another EASA service center do the VPI process for you. Another is to buy your own system at a considerable capital investment. There is also another option. We decided that the way to provide VPI processing was to build our own system. Most EASA service centers have a talented collection of people with numerous skills. Ours is no exception. We felt that we had the skills in house to do the job. All we needed was some hardware and to do a bit of research into how the process works

Getting The Most From Your Electric Motors

Getting The Most From Your Electric Motors - coverThis 40-page booklet provides great advice for obtaining the longest, most efficient and cost-effective operation from general and definite purpose electric motors.

This booklet covers topics such as:

  • Installation, startup and baseline information
  • Operational monitoring and maintenance
  • Motor and baseline installation data
  • How to read a motor nameplate
  • Motor storage recommendations

LEARN MORE AND DOWNLOAD MÁS INFORMACIÓN Y DESCARGAR BUY PRINTED COPIES

READ MORE ABOUT THE FEATURES AND BENEFITS

EASA/AEMT Rewind Study

EASA Rewind Study cover

The Effect of Repair/Rewinding on Premium Efficiency/IE3 Motors
Tests prove Premium Efficiency/IE3 Motors can be rewound without degrading efficiency.

DOWNLOAD THE FULL RESULTS

ANSI/EASA AR100-2020

ANSI/EASA AR100-2015 cover

Recommended Practice for the Repair of Rotating Electrical Apparatus
This is a must-have guide to the repair of rotating electrical machines. Its purpose is to establish recommended practices in each step of the rotating electrical apparatus rewinding and rebuilding processes.

DOWNLOAD - ENGLISH

DESCARGAR - ESPAÑOL

EASA Technical Manual

EASA Technical Manual cover

Revised September 2022
The EASA Technical Manual is the association's definitive and most complete publication. It's available FREE to members in an online format. Members can also download PDFs of the entire manual or individual sections.

VIEW & DOWNLOAD